2.Assembly and Wiring
2.1 Remove The Protective Film
Remove The Protective Film
2.2 Assemble The Motor
Assemble The Motor
2.3 Assemble The Line-tracking
Assemble The Line-tracking
2.4 Assemble The Copper Pillar
Assemble The Copper Pillar
2.5 Assemble The UNO And Shield
Assemble The UNO And Shield
2.6 Assemble The Cell Box
Assemble The Cell Box
2.7 Assemble The Camera Holder
Assemble The Camera Holder
2.8 Assemble The Ultrasonic Sensor
Assemble The Ultrasonic Sensor
2.9 Assemble The Camera Module
Assemble The Camera Module
2.10 Assemble The SG90 Servo
Assemble The SG90 Servo
2.11 Ultrasonic Sensor Wiring
Ultrasonic Sensor Wiring
2.12 Camera Module Wiring
Camera Module Wiring
2.13 Line Tracking Module Wiring
Line Tracking Module Wiring
2.14 SG90 Servo Wiring
SG90 Servo Wiring
2.15 Motor Wiring
Motor Wiring
2.16 Cell Box Wiring
Cell Box Wiring
2.17 Complete Wiring
Complete Wiring
2.18 Assemble The Acrylic Plate
Assemble The Acrylic Plate
2.19 Assemble The Tires
Assemble The Tires
2.20 Assembly Completed
Assembly Completed
2.21 Assemble The Battery
Assemble The Battery