2.Assembly and Wiring
========
.. raw:: html
.. raw:: html
2.1 Remove The Protective Film
------------------
.. raw:: html
2.2 Assemble The Motor
----------------------
.. raw:: html
2.3 Assemble The Line-tracking
---------------------------------
.. raw:: html
2.4 Assemble The Copper Pillar
---------------------------------
.. raw:: html
2.5 Assemble The UNO And Shield
---------------------------------
.. raw:: html
2.6 Assemble The Cell Box
---------------------------------
.. raw:: html
2.7 Assemble The Camera Holder
---------------------------------
.. raw:: html
2.8 Assemble The Ultrasonic Sensor
-----------------------------------
.. raw:: html
2.9 Assemble The Camera Module
---------------------------------
.. raw:: html
2.10 Assemble The SG90 Servo
---------------------------------
.. raw:: html
2.11 Ultrasonic Sensor Wiring
---------------------------------
.. raw:: html
2.12 Camera Module Wiring
---------------------------------
.. raw:: html
2.13 Line Tracking Module Wiring
---------------------------------
.. raw:: html
2.14 SG90 Servo Wiring
---------------------------------
.. raw:: html
2.15 Motor Wiring
---------------------------------
.. raw:: html
2.16 Cell Box Wiring
---------------------------------
.. raw:: html
2.17 Complete Wiring
---------------------------------
.. raw:: html
2.18 Assemble The Acrylic Plate
---------------------------------
.. raw:: html
2.19 Assemble The Tires
---------------------------------
.. raw:: html
2.20 Assembly Completed
---------------------------------
.. raw:: html
2.21 Assemble The Battery
---------------------------------
.. raw:: html